Back to All Models
MEF Homes

Model A3,029 sq.ft.

Our largest plan at 3,029 sq.ft. total built — 4 bedrooms, 2 full baths, open-concept living, 2-car garage and uncovered patio.

4
Beds
2
Baths
2
Garage
1
Story
Model A hero - completed new construction home front view
Model A 3D floor plan — left garage configuration
3D Floor Plan
Download Brochure
41 documented photos
8 construction phases
Drone + on-site documentation
From Empty Lot to Move-In Ready

The Complete Build Process

Every phase of construction documented with real photos. Full transparency from the first day to key handover.

01

Site Preparation

Vacant lot surveyed, cleared, and prepared for construction. Survey stakes placed and building pad marked.

Survey & stakingLot clearingBuilding pad layout
Aerial drone view of the empty lot before construction
1 / 1
02

Foundation

Underground plumbing installed, formboards set, and monolithic slab poured with concrete pump truck.

Underground plumbingFormboard & rebarConcrete pourSlab finishing
Underground plumbing lines installed before slab pour
1 / 4
03

Block Walls

CMU block walls erected on the cured slab, filled with rebar and concrete for hurricane-rated structural integrity.

Block wall layoutCMU installationRebar placementConcrete fill
Aerial drone view of block walls erected on slab
1 / 7
04

Framing & Roof

Engineered wood trusses set by crane, interior framing completed, roof sheathing, underlayment and shingles installed.

Lumber deliveryTruss delivery & setInterior framingRoof sheathingUnderlaymentShingle installation
Lumber packages delivered and staged on site for framing
1 / 7
05

Rough-Ins (MEP)

HVAC ductwork, electrical wiring, and plumbing rough-in installed before walls are closed. All systems inspected.

HVAC ductworkElectrical rough-inPlumbing rough-inInsulationInspections
HVAC ductwork installed in ceiling space
1 / 6
06

Interior Finish

Drywall hung and finished, tile flooring laid, kitchen cabinets and quartz countertops installed.

Drywall installationMud & tapeTile flooringCabinets & countertopsFixtures
Drywall installed and mudded throughout the home
1 / 5
07

Exterior & Landscaping

Stucco applied and painted, impact windows and doors installed, sod laid, driveway poured and landscaping completed.

Stucco & paintImpact windows & doorsDrivewaySod & landscaping
Stucco applied to exterior walls before painting — front view with entry porch
1 / 5
08

Final Delivery

Certificate of Occupancy obtained. Interior finishes completed, appliances installed, and keys handed to the new homeowners.

Final inspectionsC.O. issuedAppliance installFinal cleanKey handover
Happy homeowners celebrating on move-in day
1 / 6
Happy homeowners celebrating in front of their new MEF Home on move-in day

Another Happy Family

Move-in day — from empty lot to dream home, built by MEF Homes

Ready to Build Model A?

Your lot can be your down payment. We handle everything from permits to C.O. — turnkey delivery.