From Empty Lot to Move-In Ready

The Complete Build Process

Every phase of construction documented with real photos. Full transparency from the first day to key handover.

01

Site Preparation

Vacant lot surveyed and staked for construction. Building pad marked and site cleared.

Survey & stakingLot clearingBuilding pad layout
Empty residential lot before construction begins
1 / 3
02

Foundation

Formboards set, underground plumbing installed with pressure test, rebar and vapor barrier placed, and monolithic slab poured.

FormboardUnderground plumbingPressure testRebar & vapor barrierConcrete pour
Formboards set defining the slab footprint
1 / 7
03

Block Walls

CMU blocks delivered and walls erected. Rebar placed in cells, walls filled with concrete for hurricane-rated strength.

Block deliveryCMU installationRebar placementConcrete fill
CMU blocks stacked on site ready for wall construction
1 / 6
04

Framing & Roof

Lumber delivered, engineered trusses set, interior framing completed. Underlayment and architectural shingles installed.

Lumber deliveryTruss installationInterior framingUnderlaymentShingles
Lumber packages delivered and staged on site
1 / 7
05

Rough-Ins (MEP)

Plumbing, HVAC ductwork, and electrical wiring rough-in installed. Impact windows set before walls are closed.

Plumbing rough-inHVAC ductworkElectrical wiringImpact windows
Plumbing rough-in pipes visible through open wall framing
1 / 5
06

Interior Finish

Drywall installed and finished, wood-look tile flooring laid, cabinets, quartz countertops, and premium fixtures installed. Kitchen features pot filler and wine cooler.

DrywallTile flooringCabinets & countertopsFixturesAppliances
Drywall being hung — ceiling done, Fi-Foil insulation visible on lower walls
1 / 8
07

Exterior & Landscaping

Stucco applied and painted, driveway poured, final grading, sod and pathway lighting installed. Builder on-site with drone documentation.

Stucco & paintDrivewayFinal gradingLandscapingPathway lights
Home exterior prepped and ready for stucco application
1 / 7
08

Final Delivery

All inspections passed, Certificate of Occupancy obtained. Move-in ready with finished kitchen, bathrooms, and open-concept living.

Final inspectionsC.O. issuedFinal cleanKey handover
Completed Model B — front exterior with fresh landscaping and driveway
1 / 7