Model D2,607 sq.ft.

2,607 sq.ft. total built — 4 bedrooms, 2 baths, open living, 2-car garage and covered patio.

4
Beds
2
Baths
2
Garage
1
Story
Model D hero - completed new construction home front view
Model D 3D floor plan — left garage configuration
3D Floor Plan
Download Brochure
67 documented photos
8 construction phases
Drone + on-site documentation
From Empty Lot to Move-In Ready

The Complete Build Process

Every phase of construction documented with real photos. Full transparency from the first day to key handover.

01

Slab & Block Walls

Concrete slab poured with plumbing stubs in place. CMU block walls constructed with window and door openings, reinforced with concrete lintels.

Concrete slabPlumbing stubsCMU block wallsLintels & openings
Interior view of slab with CMU block walls and plumbing stubs
1 / 8
02

Framing & Trusses

Lumber delivered on site. Roof trusses set and secured with hurricane ties. Interior wall framing erected to define rooms. Impact-rated windows installed.

Lumber deliveryRoof trussesInterior framingWindow installation
Lumber packages delivered and staged on site with block structure in background
1 / 5
03

Rough-Ins (MEP)

Plumbing, HVAC ductwork and electrical wiring roughed in throughout the home. All mechanical systems installed before walls are closed up for inspection.

Plumbing rough-inHVAC ductworkElectrical wiringMEP inspection
Plumbing pipes and HVAC ducts running through wood framing
1 / 6
04

Roofing

Roof underlayment installed over plywood sheathing for waterproofing. Architectural shingles laid from eaves to ridge with proper overlap for hurricane wind resistance.

UnderlaymentDrip edge & flashingShingle installationRidge cap
Aerial drone view of full roof underlayment installed over plywood sheathing
1 / 7
05

Interior Finish

Fi-Foil insulation installed on exterior walls. Drywall hung, mudded and sanded. Interior painted throughout. Floor and wall tiles set with precision leveling. Kitchen cabinets, quartz countertops and appliances installed.

InsulationDrywallInterior paintTile installationCabinets & quartzAppliances
Fi-Foil vapor shield insulation installed on framed walls before drywall
1 / 11
06

Exterior Finish

Wire lath applied to block walls, followed by two-coat stucco and exterior paint. Septic system and drain field installed. Site graded, driveway poured and garage door installed.

Wire lath & stuccoExterior paintSeptic & drain fieldGrading & driveway
Happy homeowner visiting the job site with Matías — drone shot with freshly painted home behind
1 / 8
07

Final Details & Delivery

Interior fixtures and appliances finalized. Sod installed across the entire yard. Landscaping trees and mulch beds placed. Home cleaned and prepped for Certificate of Occupancy.

Interior completionSod installationLandscaping & treesCO ready
Kitchen wall cabinets with LED under-cabinet lighting, stainless steel appliances with protective film
1 / 9
08

Delivery Showcase

Professional photography of the completed home — interior with and without virtual staging, kitchen, bathrooms, open living areas, garage, and full exterior with landscaping.

Virtual stagingInterior photographyExterior photographyDrone aerials
Virtually staged open-concept living and dining area with modern furniture, kitchen island and pendant lights
1 / 13

Ready to Build Model D?

Your lot can be your down payment. We handle everything from permits to C.O. — turnkey delivery.